国产91不卡在线观看_惠民福利日韩在线欧美高清一区_亚洲欧美日韩国产综合v在线观看_欧美日韩中文字幕不卡免费_一级成人a免费视频_1024手机看片人妻无码旧版_欧美高清一二三四区_大地资源网高清在线观看动漫_亚洲精品在线观看免费_亚洲国产制服丝袜无码av

Welcome to Ningbo Tianxiang Precision Casting Co., Ltd!

Silica sol casting manufacturer
Your current location : home >> Products >> Cylinder accessories
Cylinder accessories

Cylinder accessories

  • Classification:Cylinder accessories
  • Release date:2020-06-08 14:32:02
24-hour free consultation hotline:13567493235
  • Product overview

Material is QT450

The zinc alloy die casting factory will hang the mold group after sanding in the mold base car, push the message to the whole surface dry room for dry manic after the whole car is full.

In the processing of zinc alloy die casting, when the first layer is dry hot for 6 hours, check the dry hot level; if the dry hot level is up to the standard, just start the second layer of work.

Blow away the unnecessary floating sand, soak in the pre wetting agent produce after infiltration; remove it immediately carry out the second coating as soon as possible.

Apply the second layer (joint layer) slurry, the actual operation is the same as above.

Sand spreading in the second layer:

When the second layer of mixed quartz sand is specified for the casting

When the casting requirements are high, the second layer is too much sand. Put the soaked shell mold into the floating sand bucket to apply sand, check the all-round cover; shake off the unnecessary floating sand.

Hang the shell mold after the excellent sand in the mold carrier car, push the information to the second layer drying room to carry out drying.

When the second layer is dry for 8 hours, check its dry humidity. If it reaches the standard, carry out the construction coating of structural reinforcement layer.

Blow away the unnecessary floating sand, infiltrate the third layer of pre wetting agent (the same as before), then apply the third layer of slurry sand again in the same way.

After the third layer is applied with sand, the shell mould after the excellent sand is hung in the mould carrier car sent to the drying room of the structural reinforcement layer for drying.

The fourth fifth holes of the structural reinforcement layer are N1, which is called NR, soaked with pre wetting agent, stained with the slurry of the structural reinforcement layer, then sand size as required


氣缸附件

Label

Last article:Cylinder accessories2020-06-08
Next article:Cylinder accessories2020-06-08

Recently:

Related products

Related news

  • 13567493235

    13567493235

  • 0574-88787776

    0574-88787776

  • Beside Matou station, Qiucun Town Fenghua, Ningbo City, Zhejiang Province

    Beside Matou station, Qiucun Town Fenghua
    Ningbo City, Zhejiang Province

  • Beside Matou station, Qiucun Town, Fenghua, Ningbo

    Beside Matou station, Qiucun Town
    Fenghua, Ningbo