国产91不卡在线观看_惠民福利日韩在线欧美高清一区_亚洲欧美日韩国产综合v在线观看_欧美日韩中文字幕不卡免费_一级成人a免费视频_1024手机看片人妻无码旧版_欧美高清一二三四区_大地资源网高清在线观看动漫_亚洲精品在线观看免费_亚洲国产制服丝袜无码av

Welcome to Ningbo Tianxiang Precision Casting Co., Ltd!

Silica sol casting manufacturer
Your current location : home >> Products >> Cylinder accessories
Cylinder accessories

Cylinder accessories

  • Classification:Cylinder accessories
  • Release date:2020-06-08 14:33:58
24-hour free consultation hotline:13567493235
  • Product overview

Material is QT450

Practical operation rules of wax sprue tube processing technology for precision casting suppliers

Regulations on processing technology

Indoor temperature 22 ℃± 2 ℃

Injection wax temperature 70-75 ℃

The curing time depends on the type of sprue

Operation process

Overall sprue suppression

The precision casting manufacturer shall check whether the standard air pressure, holding barrel temperature, actual operation buttons, etc. of the material pipe wax pressing machine are all normal, adjust the main parameters such as the injection working pressure of the equipment according to the technical requirements.

Place the runner (material pipe) abrasives on the surface of the equipment table, check whether the wax nozzle of the equipment is consistent with the height of the wax injection mouth of the abrasives, whether the opening closing of the abrasives are complete,

Open the abrasives, spray a little clinical diagnostic agent, place screw cap, close the abrasives, point to the wax nozzle.

Press the key in the working process with both hands to restrain the sprue (material pipe) wax mold.

At the end of inhibition, pull out the mandrel, open the grinding tool, take off the sprue (feed pipe) wax mold carefully, put it into the cooling circulating water. Pay attention to the defective reimbursement.

Remove the residual wax the abrasives.

Spray clinical diagnosis agent, put screw cap, close type, carry out the next inhibition, so as to manufacture reciprocating circulation system.

Remove the wax sprue after it is cooled for 3-5min, then blow the water drop with air compression, put it to a specific place.

After each shift is off duty the application of abrasives is completed, the machine equipment abrasives shall be cleaned up.

氣缸附件

Label

Last article:Cylinder accessories2020-06-08
Next article:Cylinder accessories2020-06-08

Recently:

Related products

Related news

  • 13567493235

    13567493235

  • 0574-88787776

    0574-88787776

  • Beside Matou station, Qiucun Town Fenghua, Ningbo City, Zhejiang Province

    Beside Matou station, Qiucun Town Fenghua
    Ningbo City, Zhejiang Province

  • Beside Matou station, Qiucun Town, Fenghua, Ningbo

    Beside Matou station, Qiucun Town
    Fenghua, Ningbo